Where it used to take a few days to remove the mechanical parts of the door, the new doors can now be opened within minutes. With the new door installed, De Haas has moved into the building, now neighbouring Franklin Offshore. The building now meets all modern standards.
Part of the old door is still at the Shipbuilding Shed and will be reused as artwork.